Project summary
New construction of a building designed to accommodate high-capacity overhead travelling cranes. For this project, Construction Longer created a base for a production machine of particular complexity: over 20 different elevations, nearly 400 anchors, shafts and tunnels.
Activity sector
Industrial
Budget
2.5M$ to 5M$
Surface area
31 215 ft2
Schedule
± 19 Weeks
Realisation date
2019




The challenge
The precision required to install a multitude of anchors at different angles, elevations and capacities.