Spiralco
Project summary
New construction of a building designed to accommodate high-capacity overhead travelling cranes. For this project, Construction Longer created a base for a production machine of particular complexity: over 20 different elevations, nearly 400 anchors, shafts and tunnels.
Industrial
2.5M$ to 5M$
31 215 ft2
± 19 Weeks
2019
The challenge
The precision required to install a multitude of anchors at different angles, elevations and capacities.