Century 21

Project summary

Formerly a food market built by Construction Longer in 2013, the second floor of this steel-framed building was split in two, stripped and rebuilt to suit the new office use with a restaurant next door.

Activity sector

Commercial

budget

500 000$ to 2.5M$

Surface area

5 000 ft2

Schedule

± 16 Weeks

Realisation date

2022

Challenge #1

Given the use of the premises, confidentiality was an important issue. Particular attention was therefore paid to the composition of the various elements, such as window glazing, door hardware and partitioning. Sound-absorbing elements were also integrated into the design of the premises.

Challenge #2

As the floor was shared with another room, natural light was available on two sides. Therefore, strategies were put in place to ensure maximum brightness for all offices and workspaces. For example, large bay windows were installed at the front of the perimeter offices. The central offices, on the other hand, were built like boxes to allow light to flow through and over them.

Expertise used

Have a project in mind?

Contact us!