Bridge 410

Project summary

Construction of 2 parallel highway bridges, each with 5 spans and a total length of over 300m. The structures cross the Massawippi River, the railroad line and Winder Street. The work briefly included construction of the deep foundations on driven piles or caisson piles, construction of the foundation units, installation of the steel structure and construction of the concrete deck.

Activity sector

Civil Works

budget

20M$ to 50M$

Schedule

± 104 Weeks

Realisation date

2020

The challenge

One of the project’s many challenges was the construction of a curved, variable-width concrete deck over 300m long. To achieve this, we had to plan and coordinate the engineering as well as the fabrication of the formwork for each of the deck bays in different ways. All formwork supports were prefabricated to suit their location on the deck. 